Embraer's Speed Bump No Big Delay | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-01.13.25

Airborne-NextGen-01.14.25

Airborne-Unlimited-01.15.25

Airborne-FltTraining-01.16.25

Airborne-Unlimited-01.17.25

Wed, Aug 20, 2003

Embraer's Speed Bump No Big Delay

Aircraft SN 004 to Resume Test Program Soon

Embraer announced on Tuesday that one of the test EMBRAER 170s made an unintentional gear-up landing at the test facility at Gaviao Peixoto last Sunday, causing minor damage to the aircraft with no injuries. The incident, caused most probably by 'operational factors,' will not affect the EMBRAER 170 certification program, scheduled for November.

The aircraft, EMBRAER 170 S/N 0004, is expected to be repaired and reenter the flight test campaign in the coming weeks. Damage was limited to engine nacelles and to the lower aft fuselage. Repairs were initiated immediately and no changes in the EMBRAER 170 certification schedule are expected. The other six aircraft remain fully engaged in the development program.

The EMBRAER 170 certification campaign moves on according to schedule, having already reached its final stages, with more than 90 percent of the tests successfully completed.

The EMBRAER 175 successfully performed its maiden flight on June 14th and certification is expected to take place in the 3rd Quarter 2004. The EMBRAER 190 certification program is scheduled for the 3rd Quarter 2005 followed by the EMBRAER 195 certification during the 3rd Quarter 2006.

Currently the EMBRAER 170/190 family has 244 firm orders and 309 purchase options from SWISS, Air Caraibes, Alitalia, GECAS, LOT, US Airways and JetBlue.

FMI: www.embraer.com.br

Advertisement

More News

NTSB Prelim: Vans RV-7A

Unable To Make It To E63, The Pilot Initiated A Forced Landing To A Field With Tall Desert Vegetation On December 22, 2024, about 1639 mountain standard time, an experimental amate>[...]

ANN's Daily Aero-Linx (01.19.25)

Aero Linx: HH-60G Pave Hawk The primary mission of the HH-60G Pave Hawk helicopter is to conduct day or night personnel recovery operations into hostile environments to recover iso>[...]

ANN's Daily Aero-Term (01.19.25): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (01.20.25)

Aero Linx: X-51A Waverider The experimental X-51A Waverider is an unmanned, autonomous supersonic combustion ramjet-powered hypersonic flight test demonstrator for the U.S. Air For>[...]

Airborne 01.15.25: FBI Drone Most Wanted, XB-1 Hits .95M, SnF25 Coverage Plans

Also: 727 Sold 4 $10K, Hartzell Carbon Voyager, Duffy Supported, FL Airpost Name Change The FBI is not kidding around with the pilot of the drone that was involved in a mid-air col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC