Wed, Nov 04, 2015
	
	
		 Unveils Advanced Production Line Technology
    Bombardier Business Aircraft opened its doors to media Tuesday as the company showcased the first two Global 7000 flight test vehicles (FTVs) at the Company's state-of-the-art assembly line in Toronto.
    
    "The Global 7000 aircraft flight test vehicles are being assembled on the most advanced production line in business aviation," said David Coleal, President, Bombardier Business Aircraft. "With a no-compromise approach and forward-thinking technology, we are focused on bringing the game-changing Global 7000 aircraft to market."
    Bombardier is employing the highest caliber technology throughout the entire manufacturing process for the Global 7000 and Global 8000 aircraft program. The final assembly line in Toronto features a state-of-the-art automated positioning system that moves the wing structure into place for joining with the fuselage. This system uses laser-guided measuring to ensure components of the aircraft are joined consistently and perfectly each time.
    Laser-guided technology is also a key feature of the final assembly line's articulated robot drilling. Designed to ensure consistent quality and repeatability, the robot drilling features a tolerance for accuracy and precision within less than one thousandth of an inch. Combining human ingenuity with the most advanced machines, the Global 7000 and Global 8000 final assembly line is a testament to the commitment Bombardier has made to deliver the most advanced aircraft to the market.
    
    "We're excited by the unprecedented precision and quality we've observed on the assembly of the first two flight test vehicles," said Michel Ouellette, Senior Vice President, Global 7000 and Global 8000 Program. "This further validates that Bombardier made the right choice in the technology it is employing to build the most advanced business jet on the market."
    The Global 7000 and Global 8000 aircraft program is progressing as planned. Flight test vehicles one and two were on display during the event on the high-tech final assembly line in Toronto, and two additional flight test vehicles are in various stages of production and assembly. The program's integrated aircraft ground tests are also making good progress across 15 facilities.
    (Top image provided with Bombardier news release. Lower image from file)
    
		
		
	 
	
	
 
	
		More News
	
	
	        
		
	         
			Musk Claims the Tech Could Be Unveiled Within a Couple of Months Elon Musk is once again promising the impossible…this time, in the form of a Tesla that flies. Speaking on T>[...]
			
	        
			
		
	        
 
			NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]
			
	        
			
		
	        
 
			"It was pretty dang cool to be in a tube-and-fabric bush plane that high, and it was surreal hearing airline pilots over ATC wondering what a Cub was doing up there. The UL is trul>[...]
			
	        
			
		
	        
 
			Aero Linx: Lake Amphibian Club Over the years the cost of a new Skimmer or Lake went from about $16,000 to over $500,000 for many reasons. Sales of Renegades have been very sparse >[...]
			
	        
			
		
	        
 
			From 2024 (YouTube Edition): Clinic Aimed to Promote Safe Aircraft Control The EAA Pilot Proficiency Center hosted an angle of attack (AOA) training clinic during the 2024 Oshkosh >[...]