NASA Successfully Reboots Mars Odyssey Orbiter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Thu, Mar 12, 2009

NASA Successfully Reboots Mars Odyssey Orbiter

CTRL-ALT-DEL-Red Planet

NASA's Mars Odyssey orbiter properly followed commands sent Wednesday to shut down and restart, a strategy by its engineers to clear any memory flaws accumulated in more than five years since Odyssey's last reboot.

The procedure also restored Odyssey's onboard set of backup systems, called the spacecraft's "B side," allowing its use in the future when necessary.

"For nearly two years, we have not known for certain whether the backup systems would be usable, so this successful reboot has allowed us to ascertain their health and availability for future use," said Odyssey Project Manager Philip Varghese of NASA's Jet Propulsion Laboratory, Pasadena, CA.

Odyssey has been orbiting Mars since 2001 and has never switched from its primary set of components, the "A side," to the backup set, which includes an identical computer processor, navigation sensors, relay radio and other components. In March 2006, the B-side spare of a component for managing the distribution of power became inoperable. Analysis by engineers identified a possibility that rebooting Odyssey might restore that component, which proved to be a side benefit of today's procedure to refresh onboard memory.

The Odyssey team began a series of steps after the reboot to carefully return the spacecraft to full functioning over the next few days. Following that path, the science instruments will be back to studying Mars by next week.

An unexpected rise in temperature of the star camera in Odyssey's navigation system on March 9 had prompted a postponement of the rebooting originally scheduled for the next day, as ANN reported. Engineers identified the cause as a heater circuit that was temporarily stuck "on." The circuit was turned off before Wednesday's reboot.

JPL, a division of the California Institute of Technology, Pasadena, manages Mars Odyssey for the NASA Science Mission Directorate, Washington. Lockheed Martin Space Systems, Denver, is the prime contractor for the project and built the spacecraft.

FMI: www.nasa.gov/mission_pages/odyssey

Advertisement

More News

Airborne 07.11.25: New FAA Boss, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Rick Kenin New Board Chair of VAI

30-Year USCG Veteran Aviator Focusing On Member Benefits The Vertical Aviation International Board of Directors announced its new leadership officers in April, and all began their >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC