Triumph Awarded Contract For Trent XWB Engine Components | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jan 29, 2017

Triumph Awarded Contract For Trent XWB Engine Components

Signs Eight-Year Agreement With Rolls-Royce

Triumph Group has finalized an eight-year agreement with Rolls Royce to supply thrust links for the Trent XWB engine program. Triumph Precision Components will deliver the first components in 2019 following a two-year development period in which Triumph Integrated Systems will perform structural tests for the thrust link components.

“This contract with Rolls Royce demonstrates how Triumph businesses work together to meet the needs of our customer as One Triumph,” said Rick Rosenjack, executive vice president of Triumph Precision Components. “We look forward to supporting the Trent XWB engine program for many years to come.”

Thrust links are critical structural components used to transfer thrust loads from the engine casing to the aircraft structure. Strength, weight, and reliability are critical features of these components, and the Toronto facility of Triumph Precision Components has been manufacturing thrust links of various designs for the past 20 years.

Triumph Precision Components produces close-tolerance parts to customer designs and model-based definition, including a wide range of aluminum, hard metal and composite structure capabilities. Capabilities include complex machining and turning, sheet metal fabrication, forming, advanced composite and interior structures, joining processes such as welding, autoclave bonding and conventional mechanical fasteners and a variety of special processes including super plastic titanium forming, aluminum and titanium chemical milling and surface treatments.

(Image provided with Triumph Group news release)

FMI: www.triumphgroup.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC