NASA Delays SIRTF Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Apr 21, 2003

NASA Delays SIRTF Launch

Booster Problems Cited

NASA managers have decided to postpone the launch of SIRTF (Space Infrared Telescope Facility) aboard a Boeing Delta II rocket until no earlier than mid-August 2003.

The delay will allow engineers enough time to change out one of the nine solid rocket motors attached to the Delta II rocket, which had multiple delaminations within the layers of material that comprise the engine-nozzle exit-cone liner.

"There simply is not enough time to remove and replace the rocket motor to support a SIRTF launch in advance of the Mars Exploration Rover-B launch window," said Karen Poniatowski, Assistant Associate Administrator for Launch Services at NASA Headquarters, Washington.

The upcoming launch dates of the Mars Exploration Rovers (MER A and B), also on Delta II rockets, are June 6 and June 25, respectively. The MER-A mission, originally scheduled for May 30, was recently rescheduled to June 6 due to a potential problem with cabling on the spacecraft.

The launch of the Galaxy Evolution Explorer mission, or GALEX, is on schedule for launch on a Pegasus rocket on April 28.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC