Boeing Emphasizes Affordability, Modularity In New ICBM Design | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.25.25

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Tue, Dec 05, 2017

Boeing Emphasizes Affordability, Modularity In New ICBM Design

Review With U.S. Air Force Confirms Baseline Requirements For Ground-Based Nuclear Deterrent

Boeing’s Ground Based Strategic Deterrent (GBSD) program has undergone its first key review with the U.S. Air Force, validating program technical requirements prior to the design and development phase of America’s next intercontinental ballistic missile system.

The November review established the baseline for the GBSD, which will replace the Minuteman III intercontinental ballistic missile (ICBM) and continue the nuclear deterrence mission for generations to come.

Boeing completed the System Requirements Review about two months after being awarded $349 million to mature the GBSD system design under a Technology Maturation and Risk Reduction contract.

“The Air Force set clear system design requirements early in the acquisition process,” said Frank McCall, Boeing director of Strategic Deterrence Systems and GBSD program manager. “Thanks to this straightforward guidance, the Boeing team was able to focus on options that would meet those requirements and provide the capability needed to deter an evolving threat.”

“We concentrated on modularity and affordability to enable efficient government ownership of the system through 2075 and beyond,” McCall added.

Boeing’s design addresses the replacement of the entire ICBM system, including new flight systems, weapon system command and control (WSC2), and launch systems within existing Minuteman silos.

Now that the requirements baseline has been set, Boeing will move through a series of cost-capability studies, weighing affordability against configuration options to come up with a GBSD solution that is capable, flexible and affordable.

Boeing will present its Preliminary Design Review to the Air Force in 2020.

(Source: Boeing news release)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (08.27.25)

Aero Linx: The American Society of Aerospace Medicine Specialists (ASAMS) The Society is a non-profit organization created to serve as a voice for and represent the professional ne>[...]

ANN's Daily Aero-Term (08.27.25): Class C Service

Class C Service This service provides, in addition to basic radar service, approved separation between IFR and VFR aircraft, and sequencing of VFR aircraft, and sequencing of VFR a>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Airborne-NextGen 08.26.25: Iran UAV Knockoffs, X-37B Spaceplane, Army Training

Also: ERAU Uses UAVs, P550 Group 2 UAS, Starship’s Florida Launches, NASA Missions Chopped The Air Force has put out a call to commission a one-to-one copy of the Iranian-des>[...]

Classic Klyde Morris (08.25.25)

Classic Klyde Morris From 11.07.16 (and Remembering Bob...) FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC