High-Altitude Airport First to Pass Security Audit | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, May 02, 2003

High-Altitude Airport First to Pass Security Audit

El Alto International: First in The Americas to Pass ICAO's Aviation Security Audit

El Alto International Airport (LPB), located at about 13,000 foot altitude, above La Paz, Bolivia, is the first airport in the Western Hemisphere, and third in the world, to successfully pass the International Civil Aviation Organization's (ICAO) Universal Security Audit Program (USAP). El Alto is managed by SABSA, a private company owned by the London-based global airport operator, TBI plc. (SABSA manages El Alto under a 25-year contract with the Bolivian Government, as well as two other airports in Bolivia: Jorge Wilstermann International Airport in Cochabamba, and Viru Viru International Airport in Santa Cruz.)

The audit was designed to assess ICAO member state's National Civil Aviation Security Program (NCASP) and compliance with ICAO standards. It was conducted by a team of four certified ICAO audit members between March 28th and April 10th, 2003. Normally, ICAO provides six months notice of their wish to perform this audit. SABSA was given less than two months notice. Commenting on the success of the audit, Anthony Alicastro, Managing Director of SABSA, "We are very pleased to see the hard work of SABSA's staff and the team here at El Alto recognized by ICAO. For some time now, we have been working with TBI through an internal safety and security program called 'Business Risk Assurance,' this was critical in allowing us to accept ICAO's request to perform the audit with less than two months notice."

Felicitaciones.

FMI: www.tbiplc.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC