RV-10 Kits To Be Produced With Final-Size Holes Drilled | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Aug 04, 2020

RV-10 Kits To Be Produced With Final-Size Holes Drilled

RV-10 Construction Just Got A LOT Easier

Van’s Aircraft has initiated the process of phasing in the production of final-size, matched-hole RV-10 parts. Until now, all parts for the RV-10 have been produced with slightly undersized holes, which the builder must up-size with a drill and then debur prior to assembly.

The company notes that, "We will be transitioning the RV-10 kit to final-sized holes, much like the RV-14 and RV-12iS kits. There is no increase in kit prices associated with this planned change.

We are excited to remove a portion of the initial work that builders need to perform on certain parts of the RV-10 airframe assembly with this change. Aircraft parts with final-size holes may be dimpled and then assembled right out of the box, after deburring the edges of each part as needed. This removes the need to first cleco the parts together, drill them to size in assembly, then disassemble and debur.

This manufacturing transition will take place over the next several months (we anticipate completing the transition sometime in early 2021). During the transition period, customers may receive some portion of their parts with final-sized holes and others without. Van’s will mark delivered kit parts to make the builder aware whether each part needs to be final-drilled and deburred, or not. We will also include instructions for the builder explaining how to identify which kit parts are/are not final-sized."

FMI: www.vansaircraft.com

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC