Boeing Looks At Increasing Dreamliner Production To Meet Demand | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jun 09, 2006

Boeing Looks At Increasing Dreamliner Production To Meet Demand

Company Will Make Final Decision This Summer

Have you ever heard the old saying, "you have gotta make hay when the sun shines?" Well, Boeing has a bumper crop of customers waiting to take delivery of its upcoming 787 Dreamliner series of airliners... and as Airbus mulls over what to do with its competitor to the composite aircraft, more customers are looking in Boeing's direction.

Boeing has one small problem with that, albeit an enviable one: the 787 is already sold out for its first two years of production, and slots in 2011 are filling up fast.

So, what is Boeing to do? Boeing's VP of commercial airplane marketing, Randy Baseler, told Reuters recently the only answer may be to double production capacity for the 787.

"There are still a lot of people who want planes," he said.

Boeing already has 347 firm orders for the composite-bodied aircraft... and in addition to speeding up existing deliveries, adding a second line would also allow potential customers like Qatar Airlines and Israel's El Al to order planes, and have them delivered sooner than they'd have to wait for Airbus's plane to be ready... a major selling point.

Boeing is expected to make its decision this summer... and while adding a second line seems to be a no-brainer, there's also the matter of what to do with that second production line, once demand for the 787 slows down.

Well, there's always the talked-about replacement for the 737...

FMI: www.boeing.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC