Sierra Nevada Corporation Completes PDR Of The STPSat-5 Satellite | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Aug 16, 2015

Sierra Nevada Corporation Completes PDR Of The STPSat-5 Satellite

Prime Contractor For The DoD's Space Test Program

Sierra Nevada Corporation’s (SNC) Space Systems has successfully completed the Preliminary Design Review (PDR) of the STPSat-5 satellite for the Department of Defense’s (DOD) Space Test Program (STP) Office. SNC is the prime contractor on the STPSat-5 program, leading the design and integration of this next-generation science and technology demonstration satellite for the DOD.

The PDR is a comprehensive evaluation of the entire satellite and all systems; a critical milestone that must be achieved in order to proceed with the integration and test of the STPSat-5 satellite. By successfully completing PDR, SNC now moves into the Critical Design phase of the program, in which technical designs are finalized in advance of manufacturing and integration of the satellite and its payloads.

“This successful PDR validates that our STPSat-5 design meets or exceeds all mission requirements as defined by our customer,” said John Roth, vice president of business development for SNC’s Space Systems. “We appreciate the collaborative environment fostered by STP to achieve a highly-capable microsatellite that enables flight verification of key DOD technologies.”

In addition to STP customer representatives, the PDR was attended by the Operationally Responsive Space Office, Aerospace Corporation, payload representatives and NASA's Ames Research Center.

"The Air Force and our other mission partners are pleased to move this program into the next phase,” said Colonel Jason Cothern, Air Force Space and Missile Systems Center Advanced Development and Test Directorate. “We remain on-track for providing this spaceflight opportunity for five highly-ranked Space Experiments Review Board (SERB) payloads."

STPSat-5 is the first satellite to be designed using SNC’s SN-50 modular microsatellite.  The satellite can fly in a range of low-Earth orbits and in multiple launch configurations, providing a   low-cost and highly-flexible solution for science, technology and commercial missions that can be satisfied with a small satellite. Payloads are accommodated through the innovative use of a configurable interface electronics suite, and further mission flexibility is offered by a low-toxicity ‘green’ propulsion module for orbit maintenance and de-orbit requirements. The spacecraft is compatible with a variety of secondary payload launch options in addition to dedicated launch configurations and, in many cases, an ideal choice for DOD and NASA space science missions. SNC’s SN-50 is a new, highly-capable complement to our existing SN-100 and SN-200 class of small satellites.

STPSat-5, which is administered by NASA’s Ames Research Center, is the latest free-flyer spacecraft for the U.S. Air Force STP office, hosting five Government furnished payloads provided by SPAWAR, the U.S. Air Force Academy, the Naval Research Laboratory and Office of Naval Research, and the Air Force Research Laboratory. The science and technology payloads will be integrated into the satellite at SNC’s Space Systems in Louisville, Colorado, home to SNC’s small satellite production facility and Satellite Operations Center.

(Image provided by Sierra Nevada Corp)

FMI: www.sncorp.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC