AeroSports Update: Airplane Camping At AirVenture Revised | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, May 31, 2016

AeroSports Update: Airplane Camping At AirVenture Revised

‘North 40’ Airplane Camping Will Be Reduced, And ‘South 40’ Camping Will Be Added

For any airport, it’s always good news to be funded for improvements and expansions. Such is the case for Wittman Regional Airport, but the changes will also affect camping areas used by AirVenture visitors. Some of the ‘North 40’ camping will not be available this year.

A taxiway reconstruction project at Wittman Regional Airport is creating some challenges for EAA AirVenture 2016, but EAA volunteers and staff are working together to make sure that those who want to camp next to their airplanes during the “World’s Greatest Aviation Celebration” will be able to do so.

The project reconstructs Taxiway Bravo just north of Wittman’s Runway 9/27, which is surrounded by the ‘North 40’ aircraft camping area. The project at the Winnebago County-owned airport will straighten and lengthen the taxiway. However, the necessary reconstruction of the taxiway and connected construction area will eliminate some ‘North 40’ parking (up to 130 camping slots) for 2016.

The areas affected include the west end of ‘North 40’ aircraft camping just north of Runway 9/27, as well as the area between the Hilton Garden Inn and EAA’s Weeks Hangar. Portions of those areas will be unavailable in 2016. All ‘North 40’ parking slots south of Runway 9/27 and in the east end of ‘North 40’ parking north of that runway will still be available. In addition, storm sewer line work at the northeast end of Runway 5/23 will not be completed until early June, with hopes that the ground will be firm enough to park aircraft in that area.

To compensate for the aircraft camping areas lost this year to the project, EAA worked with Wittman Regional Airport to create a new aircraft camping area in the ‘South 40,’ south of the ultralight landing strip (see photo). This new area will be leveled, rolled and planted with hopes – depending on weather conditions – to be ready to welcome aircraft this summer. This will be a new, permanent area to accommodate growth of the event and to offset any development on the airport’s north side, in accordance with its master plan.

Additional amenities, including showers, food services, toilet facilities, and transportation, will be greatly enhanced to this area to provide a high-level of service to those who camp in that area. As the ‘North 40’ fills, its volunteers will shift to the new area to provide support for arriving aircraft. The “GAC” aircraft signs used by those landing at Oshkosh will be effective for both areas, as aircraft will be directed to the south area after the ‘North 40’ fills.

“The airport’s project will cause some changes for the North 40 this year, but our goal is to make these temporary situations as seamless as possible,” said Jack Pelton, EAA CEO/chairman. “Our volunteers have been great in helping us plan this transition and they are committed to make things as smooth as possible from their end. We wanted to get the word out as soon as possible to let people know of these changes and how they will have a one-year effect on the traditional North 40 plan.”

(Image of ‘South 40’ camping area provided by EAA)

FMI: www.eaa.org

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC