Boeing 787-9 Testing In Australia Could Shorten 787-10 Time To Market | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Jan 16, 2014

Boeing 787-9 Testing In Australia Could Shorten 787-10 Time To Market

Hot Weather Testing Could Be Applied To Yet-To-Be-Built Larger Airplane

Some of the testing being done on a Boeing 787-9 in Australia to determine how the airplane will deal with extremely hot conditions could be germane to the 787-10, according to Boeing engineers.

The Australian Business Traveler reports that, even though the -10 variant of the Dreamliner is still in the design phase, Lead Flight Test Engineer Dominic Thacker said that they are "actually picking up some -10 testing on this configuration."

Thacker said that some of the systems will be similar enough that the testing will be applicable to the larger variant. "If we can do some of those tests in advance on a similar airplane it helps us downstream and will save us time later," he said.

Boeing's Test Operations Manager for the 787-9 program Ryan Smith said the tests being conducted on the -9 variant are derivatives of tests what were conducted with the -8 Dreamliner. "This is just a subset of what a major model needs to go through," he said. "We've flown the -9 into testing very, very quickly," he said.

The 787-10 will be larger than the -9, and carry 330 or more passengers depending on its configuration, according to Boeing, but it will not have the range of the two smaller models. Boeing says that is balanced by maximizing the seat miles the airplane will be able to fly.

(787-9 image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC