First P-8A Poseidon Moves From Final Assembly To Preflight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Aug 14, 2008

First P-8A Poseidon Moves From Final Assembly To Preflight

Scheduled To Enter Service With US Navy In 2013

Boeing Integrated Defense Systems (IDS) and Boeing Commercial Airplanes (BCA) employees gathered this week in Renton, WA to celebrate the completion of final assembly on the first P-8A Poseidon for the US Navy and its move to preflight work.

IDS and BCA are building the P-8A, a military derivative of the 737-800, on a third final assembly production line in Renton, home to commercial 737 production.

"We're proud to have completed final assembly on the first P-8A Poseidon," said Mo Yahyavi, vice president and P-8 program manager for BCA. "Our objective on the P-8 program is to provide the Navy with the world's most advanced maritime patrol and reconnaissance aircraft. BCA and IDS working together as one team will be able to do just that."

IDS will now focus on calibrating the flight-test instrumentation onboard the aircraft before moving it to Boeing Field in Seattle early next year for systems integration and additional testing.

"Program milestones, both big and small, are met daily thanks to our outstanding Poseidon team," said Bob Feldmann, vice president and P-8 program manager. "Since the start of final assembly in late March, the team has met all assembly milestones, including wing-to-body-join and start of the moving line in May, completion of full-power testing and engine installation in June and, most recently, engine run."

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013.

FMI: www.boeing.com/ids, www.navy.mil

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC