AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Tue, Sep 19, 2017

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2017-19-11

PRODUCT: Certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 (Global Express) airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by a determination that a certain task in the aircraft maintenance manual (AMM) will not accomplish the intent of a candidate certification maintenance requirement (CCMR) for detecting dormant failures of the pitch feel (PF) and rudder travel limiter actuator (RTLA) back-up modules.

This AD requires doing an operational test of the flight control unit (FCU) back-up modules, and repair if necessary.

COST: The FAA estimates this AD affects 76 airplanes of U.S. registry. The agency also estimate that it will take about 3 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Based on these figures, the cost of this AD on U.S. operators is estimated to be $19,380, or $255 per product.

The FAA has received no definitive data that will enable us to provide cost estimates for the on-condition actions specified in this AD.

DATES: This AD is effective October 23, 2017.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (10.16.25)

“This integration marks a significant step forward in cockpit connectivity and safety. It is one of few solutions offered to business aviation and rotorcraft operators that p>[...]

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

ANN's Daily Aero-Term (10.16.25): Enhanced Flight Vision System (EFVS)

Enhanced Flight Vision System (EFVS) An EFVS is an installed aircraft system which uses an electronic means to provide a display of the forward external scene topography (the natur>[...]

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Unveils 50 Amp-hour Lithium-ion, Main Ship Battery >[...]

NTSB Final Report: Bellanca 17-30A

Shortly After Takeoff, The Engine Completely Lost Power Analysis: The pilot reported that the engine start, run-up, and takeoff were without incident. However, shortly after takeof>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC