AD: De Havilland Aircraft of Canada Limited | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.22.25

AirborneNextGen-
12.23.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.18.25

AirborneUnlimited-12.19.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jun 20, 2021

AD: De Havilland Aircraft of Canada Limited

AD 2021-12-02 Prompted By A Report That A Number Of Nacelle A-Frames Were Not Manufactured In Accordance With Engineering Drawings

The FAA is adopting a new airworthiness directive (AD) for certain De Havilland Aircraft of Canada Limited Model DHC-8-400 series airplanes.

This AD was prompted by a report that a number of nacelle A-frames were not manufactured in accordance with engineering drawings. This AD requires, depending on airplane configuration, removing the fasteners on the nacelle A-frame side brace sub-assemblies, doing an eddy current inspection for cracking, cold-working the holes, installing oversize fasteners, re-identifying the reworked side brace fitting and A-frame, and repair if necessary. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective July 20, 2021.

Supplementary Information: Transport Canada Civil Aviation (TCCA), which is the aviation authority for Canada, has issued TCCA AD CF-2020-39, dated October 14, 2020 (TCCA AD CF-2020-39) (also referred to as the Mandatory Continuing Airworthiness Information, or the MCAI), to correct an unsafe condition for certain De Havilland Aircraft of Canada Limited Model DHC-8-400 series airplanes. You may examine the MCAI in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2021-0183.

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain De Havilland Aircraft of Canada Limited Model DHC-8-400 series airplanes. The NPRM published in the Federal Register on March 22, 2021 (86 FR 15149). The NPRM was prompted by a report that a number of nacelle A-frames were not manufactured in accordance with engineering drawings. The holes in the side brace sub-assemblies were not cold-worked as required. As a result the side brace fitting might not meet its fatigue life, and cracking of the A-frame bottom flange may result. The NPRM proposed to require, depending on airplane configuration, removing the fasteners on the nacelle A-frame side brace sub-assemblies, doing an eddy current inspection for cracking, cold-working the holes, installing oversize fasteners, re-identifying the reworked side brace fitting and A-frame, and repair if necessary. The FAA is issuing this AD to address possible cracking of the A-frame. This condition, if not addressed, may lead to collapse of the main landing gear (MLG). See the MCAI for additional background information.

FMI: www.regulations.gov

Advertisement

More News

Aero-TV: DeltaHawk’s Diesel Power Steps Into the Spotlight

Its Offerings Are Lighter, Cleaner, and Now Pushing Past 1,000nm on SAF Jet Fuel DeltaHawk’s diesel-powered aircraft lineup has seen incredible upgrades over the last few yea>[...]

NTSB Prelim: Mooney Aircraft Corp. M20K

The Airplane Experienced A Total Loss Of Engine Power On December 3, 2025, about 1600 central standard time, a Mooney Aircraft Corp. M20K, N57229, was substantially damaged when it>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Linx (12.20.25)

Aero Linx: European Society of Aerospace Medicine (ESAM) As a pan-European, independent forum, it works to promote the safety and health of all persons involved in aviation and spa>[...]

Aero-News: Quote of the Day (12.20.25)

“We are excited to see Wisk achieve this milestone, and I’m so proud of the team that made it possible. The team at Wisk has built advanced technologies across flight c>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC