Bombardier Tests CSeries Aircraft Composite Demonstrator Wing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.01.25 (Holiday)

Airborne-Unlimited-09.02.25

AirborneNextGen-09.03.25

Airborne-Unlimited-09.04.25

AirborneUnlimited-09.05.25

Wed, Mar 31, 2010

Bombardier Tests CSeries Aircraft Composite Demonstrator Wing

All-New Aircraft Targeted For First Deliveries In 2013

Testing of the Bombardier CSeries aircraft’s composite demonstrator wing is under way, representing another significant milestone in the development of the all-new aircraft due to enter service in 2013.  The testing is taking place at Bombardier’s Belfast facility which is responsible for the design, development and manufacture of the advanced composite wings for the CSeries aircraft.  The Belfast operation has successfully assembled a full-scale, three-quarter span pre-production demonstrator wing using its unique Resin Transfer Infusion process.

The composite wing represents an innovative leap forward in aviation design and technology.  A specially-designed rig was constructed for the demonstrator test program.  This rig represents the outer wing to center wing box and center fuselage attachments, including a simulated main landing gear leg and a simulated engine and pylon.  Controlled loading will be applied to these key areas of the demonstrator, thereby replicating the maximum loading conditions that the wing will see in service.  The subsequent data collected will enable Bombardier’s engineers to validate their stress and design assumptions.

“Producing this demonstrator has been a significant investment for us, but will bring significant benefits. Through a rigorous testing program, we will get real test data from the demonstrator which will enable us to optimize the design of the actual CSeries aircraft production wing.  This will allow us to create the lightest weight solution with the utmost confidence in the wing’s structural integrity,” said Michael Ryan, Vice President and General Manager, Bombardier Aerospace, Belfast.

“Having carried out several thousand individual material and detail tests to date, we are delighted with the progress of the CSeries aircraft wing development program, and are looking forward to gathering the data that will help us determine the wing’s final design,” Mr Ryan continued.

FMI: www.bombardier.com

Advertisement

More News

EMAS Systems Stop 2 Aircraft In Separate Incidents

Overruns Halted Safely In Chicago and Boca Raton Two EMAS – Engineered Materials Arresting Systems – were instrumental in stopping aircraft during runway overruns at Ch>[...]

NTSB Prelim: Marshall Allen L RV6A

He Reduced The Throttle Control About ¼ Inches, Heard A “Slight Pop,” And The Engine Lost Power On August 19, 2025, at 1640 central daylight time, a Vans RV-6A a>[...]

Aero-News: Quote of the Day (09.04.25)

"We are pleased to have reached this first milestone in our restructuring process, which will support normal operations as we take decisive action to ensure that Spirit continues d>[...]

ANN's Daily Aero-Term (09.04.25): VFR Not Recommended

VFR Not Recommended An advisory provided by a flight service station to a pilot during a preflight or inflight weather briefing that flight under visual flight rules is not recomme>[...]

ANN's Daily Aero-Linx (09.04.25)

Aero Linx: Sentinel Owners & Pilots Association Stinson L-5 Owners Club. Offering expertise in the Ownership, Maintenance, and History of the Stinson L-5 since 2001. The Stinso>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC