Rockwell Collins Gets Green Light For C/KC-135 GATM Upgrade | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Apr 07, 2004

Rockwell Collins Gets Green Light For C/KC-135 GATM Upgrade

Deliveries Set For April 2005

The US Air Force has authorized Rockwell Collins to begin the $36.9M Lot II, the first phase of full rate production, as part of the C/KC-135 Global Air Traffic Management (GATM) program.  This first production phase calls for the building, delivery and installation of 30 additional R-model aircraft ship sets with deliveries beginning in April 2005.  If fully executed, the GATM program could generate $600 million in revenue for Rockwell Collins.

"We are proud of this milestone and look forward to continued success with the C/KC-135 GATM program," said Rockwell Collins Chairman, President and Chief Executive Officer Clay Jones. "This milestone is a reflection of our ongoing commitment to meet budget and schedule targets for government projects."

Last summer, Rockwell Collins officials presented the US Air Force with the first C/KC-135 production aircraft equipped with Global Air Traffic Management (GATM) technology during a ceremony in San Antonio.

Prior to this first production authorization, the $55 million Phase 1 low-rate initial production option included delivery and installation of avionics for 50 C/KC-135 tanker/transport aircraft.  The Air Force then authorized the $32 million second phase of low-rate initial production as part of the GATM program. The second phase called for the building, delivery and installation of 25 additional R-model aircraft ship sets.

As the prime avionics systems integrator for the US Air Force C/KC-135 GATM program, Rockwell Collins is providing technology that prepares aircraft for changing communication/navigation/surveillance and air traffic management (CNS/ATM) requirements as the airspace transitions to Free Flight operation.

FMI: www.rockwellcollins.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC