OH TFR: 10.02.06 - 10.27.06 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Sep 30, 2006

OH TFR: 10.02.06 - 10.27.06

NOTAM Number: FDC 6/2028
Issue Date: September 29, 2006 at 19:31 UTC
Location: Ravenna, Ohio near AKRON VOR/DME (ACO)
Beginning Date and Time: October 02, 2006 at 11:00 UTC
Ending Date and Time: October 27, 2006 at 21:00 UTC
Reason for NOTAM: For demolition operations of potentially explosive contaminated buildings
Type: Hazards
Replaced NOTAM(s): N/A
Pilots May Contact: Cleveland (ZOB) Center, 440-774-0426

Affected Area(s)

 Airspace Definition:
 TFR Center: 6.4 nautical miles from AKRON VOR/DME(ACO) on the 052 radial (Latitude: 41º10'48"N, Longitude: 81º05'50"W)
 Radius: 2 nautical miles
 Altitude: From the surface up to and including 2000 feet AGL
 Effective Date(s):
 October 02, 2006 at 11:00 UTC - October 27, 2006 at 21:00 UTC

Operating Restrictions and Requirements

No pilots may operate an aircraft in the areas covered by this NOTAM (except as described).

 In effect from 1100-2100 daily.

 Only relief aircraft under the direction of Lakeshore Engineering Services are authorized in the airspace.

Other Information:

ARTCC: ZOB - Cleveland Center
Point of Contact: Lakeshore Engineering Services
 Telephone 313-595-7637
Authority: Title 14 CFR section 91.137(a)(1)

FMI: www.tfr.faa.gov, Depicted TFR data may not be a complete listing. Pilots should not use the information on this website for flight planning purposes. For the latest information, call your local Flight Service Station at 1-800-WX-BRIEF.

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC