Genesis Mission Status Report | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Oct 04, 2004

Genesis Mission Status Report

Or, What I'm Doing With The Spacecraft Since I Dug It Out Of The Ground

The Genesis team is preparing to ship its samples of the Sun from the mission's temporary cleanroom at the U.S. Army Proving Ground, Dugway, Utah, to NASA's Johnson Space Center, Houston.

"We have essentially completed the recovery and documentation process and now are in the business of preparing everything for transport," said Eileen Stansbery, Johnson Space Center assistant director of astromaterials research and exploration science. "We still have a way to go before we can quantify our recovery of the solar sample. I can tell you we have come a long way from September 8, and things are looking very, very good."

A major milestone in the process was the recovery of the Genesis mission's four separate segments of the concentrator target. Designed to measure the isotopic ratios of oxygen and nitrogen, the segments contain within their structure the samples that are the mission's most important science goal.

"Retrieving the concentrator target was our number one priority," Stansbery said. "When I first saw three of the four target segments were intact, and the fourth was mostly intact, my heart leapt. Inside those segments are three years of the solar samples, which to the scientific community, means eons worth of history of the birth of our solar system. I saw those, and I knew we had just overcome a major hurdle."

Other milestones in the recovery process included the discovery that the gold foil collector was undamaged and in excellent condition. The gold foil, which is expected to contain almost a million billion atoms of solar wind, was considered the number two priority for science recovery. The polished aluminum collector was misshapen by the impact. However, it is intact and expected to also yield secrets about the Sun. Another occurred when the cleanroom team disassembled the collector arrays. They revealed, among large amounts of useable array material, some almost whole sapphire and coated sapphire collectors and a metallic glass collector.

Packing solar samples for transport is a little different than packing a house-worth of belongings for a cross-country move. After the meticulous process of inspection and documentation, each segment of collector gets its own ID number, photograph and carrying case. The samples and shipping containers fill the space of about two full size refrigerators. The Genesis material will probably move to the Johnson Space Center within the next week.

"If you had told me September 8 that we would be ready to move Genesis samples to Houston within the month I would have replied, 'no way,'" said Genesis Project Manager Don Sweetnam of NASA's Jet Propulsion Laboratory, Pasadena (CA). "But here we are, with an opportunity to fulfill our major science objectives. It is a great day for Genesis, and I expect many more to come."

FMI: www.nasa.gov/genesis, http://genesismission.jpl.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC