And Then There Were Three ... Dreamliners Flying | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Fri, Feb 26, 2010

And Then There Were Three ... Dreamliners Flying

Boeing's ZA004 Joins 787 Flight-Test Program

A third airplane has joined the Boeing 787 Dreamliner flight-test program. ZA004, the fourth flight-test airplane to be built, took off at 1143 PST local time Wednesday from Paine Field in Everett, WA. The program plan called for ZA004 to fly before ZA003 because the data ZA004 is collecting is needed more quickly both for certification and development of the 787-9.

Captains Heather Ross and Craig Bomben completed a three-hour-and-two-minute flight at 2:45 p.m., landing at Boeing Field in Seattle. Flight-test personnel were also on board to monitor airplane performance. "Airplane No. 4 operated flawlessly today," Ross said after landing. "We've got a lot of work ahead of us but I can't imagine a better start to the flight test program for this airplane."

Ross will serve as chief pilot for ZA004. This airplane will be used to accomplish the following types of tests: aerodynamics, high-speed performance, propulsion performance, flight loads, community noise and extended operations (ETOPS) and other test conditions.

During Wednesday's flight, the airplane reached an altitude of 30,000 feet and an airspeed of 255 knots. As the testing of the 787 fleet progresses, the airplane will fly at its expected in-service maximum altitude of 40,000 feet and speed of Mach 0.85.

"We are continuing to make good progress on the flight test program," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "The team is staying focused and disciplined in keeping the priority on safety and execution of the plan."

FMI: www.boeing.com

Advertisement

More News

1st Annual Affordable Flying Exposition Gets Its Footing

“Big Things Have Small Beginnings” Set for November 6–8, 2025 at Lakeland Linder International Airport (LAL) in Lakeland, Florida, the first-ever Affordable Flyin>[...]

Aero-News: Quote of the Day (11.04.25)

“Backed by 90 years of Jeppesen’s gold-standard data and ForeFlight’s relentless spirit of exploration, this combination is building the most unified, intuitive p>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

Airborne 10.30.25: Earhart Search, SpaceX Speed Limit, Welcome Back, Xyla!

Also: Beech M-346N, Metro Gains H160 EMS STC, New Bell Boss, Affordable Flying Expo Tickets NOW On Sale! Purdue University’s Research Foundation and the Archaeological Legacy>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC