And Then There Were Three ... Dreamliners Flying | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Feb 26, 2010

And Then There Were Three ... Dreamliners Flying

Boeing's ZA004 Joins 787 Flight-Test Program

A third airplane has joined the Boeing 787 Dreamliner flight-test program. ZA004, the fourth flight-test airplane to be built, took off at 1143 PST local time Wednesday from Paine Field in Everett, WA. The program plan called for ZA004 to fly before ZA003 because the data ZA004 is collecting is needed more quickly both for certification and development of the 787-9.

Captains Heather Ross and Craig Bomben completed a three-hour-and-two-minute flight at 2:45 p.m., landing at Boeing Field in Seattle. Flight-test personnel were also on board to monitor airplane performance. "Airplane No. 4 operated flawlessly today," Ross said after landing. "We've got a lot of work ahead of us but I can't imagine a better start to the flight test program for this airplane."

Ross will serve as chief pilot for ZA004. This airplane will be used to accomplish the following types of tests: aerodynamics, high-speed performance, propulsion performance, flight loads, community noise and extended operations (ETOPS) and other test conditions.

During Wednesday's flight, the airplane reached an altitude of 30,000 feet and an airspeed of 255 knots. As the testing of the 787 fleet progresses, the airplane will fly at its expected in-service maximum altitude of 40,000 feet and speed of Mach 0.85.

"We are continuing to make good progress on the flight test program," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "The team is staying focused and disciplined in keeping the priority on safety and execution of the plan."

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC