AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Tue, Feb 18, 2020

AD: Airbus SAS Airplanes

AD NUMBER: 2020-02-20

PRODUCT: Certain Airbus SAS Model A318 series airplanes; Model A319-111, -112, -113, -114, -115, -131, - 132, and -133 airplanes; A320-211, -212, -214, -231, -232, and -233 airplanes; and Model A321-111, -112, -131, -211, -212, -213, -231, and -232 airplanes.

ACTION: Final rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-24-07, which applied to certain Airbus SAS Model A318 series airplanes; Model A319-111, -112, -113, -114, -115, -131, - 132, and -133 airplanes; A320-211, -212, -214, -231, -232, and -233 airplanes; and Model A321-111, -112, -131, -211, -212, -213, -231, and -232 airplanes.

AD 2014-24-07 required repetitive rototest inspections for cracking; corrective actions if necessary; and modification of the torsion box, which terminates the repetitive inspections.

This AD continues to require the actions in AD 2014-24-07, with certain revised compliance times, as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference.

This AD was prompted by a report of a crack found in the side box beam flange of the fuselage at the frame (FR) 43 level during a fatigue test campaign.

DATES: This AD is effective March 20, 2020.

COST: The FAA estimates that this AD affects 851 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Retained actions from AD 2014-24-07

  • Labor: 178 work-hours × $85 per hour = $15,130
  • Parts: $31,334
  • Cost per airplane: $46,464

The new requirements of this AD add no new economic burden. The FAA has received no definitive data that would enable the agency to provide cost estimates for the on-condition actions specified in this AD.

FMI: AD

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC