NASA Says Atlantis Nearly Ready For VAB Move | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Sat, Jan 20, 2007

NASA Says Atlantis Nearly Ready For VAB Move

Endeavour Being Prepped For First Launch In Four Years

Officials with NASA updated ANN Friday on the status of the orbiters slated to fly the next two shuttle missions to the International Space Station... Ed.

Mission: STS-117 - 21st International Space Station Flight (13A) -
S3/S4 Truss Segment Solar Arrays
Vehicle: Atlantis (OV-104)
Location: Orbiter Processing Facility Bay 1 Launch Date: Targeted for March 16, 2007 Launch Pad: 39A
Crew: Sturckow, Archambault, Reilly, Swanson, Forrester and Olivas Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Final vehicle closeouts are under way in preparation for technicians to move Atlantis to the Vehicle Assembly Building on February 7. This week, technicians worked to close out the forward reaction control system, the midbody and aft areas. The payload bay doors were cycled and closed for flight. The payload bay door strongbacks were removed Thursday. Final orbiter power down is scheduled for January 25.

Today, the external tank scheduled to fly with Atlantis, designated ET-124, was moved from the checkout cell in the Vehicle Assembly Building to be mated to the solid rocket boosters in high bay 1. Space Shuttle Program managers held a review on Tuesday and gave the "go ahead" to mate the tank with the boosters.

Mission: STS-118 - 22nd International Space Station Flight (13A.1) -
S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for June 28, 2007 Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Anderson Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Endeavour remains in Orbiter Processing Facility bay 2 and technicians continue preparing the vehicle for its first launch in just over four years. The vehicle has undergone an extensive modification period, including the addition of all of the return-to-flight safety upgrades added to both Discovery and Atlantis.

This week, technicians completed main propulsion system leak, functional and electrical checkouts. Late Thursday, the first of three space shuttle main engines was installed. The other two engines were scheduled to be installed Friday.

FMI: www.nasa.gov/

Advertisement

More News

Airborne 10.14.25: Laser Threat, VeriJet BK, Duffy Threatens Problem Controllers

Also: USAF Pilots, Atlanta Tower Evac, Archer Spotlight Dissipates, Hop-A-Jet Sues A social-media call for people to point lasers at aircraft flying over Portland’s ICE facil>[...]

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

Aero-News: Quote of the Day (10.17.25)

"On the way back to the United States from NATO’s Defense Ministers meeting, Secretary of War Hegseth’s plane made an unscheduled landing in the United Kingdom due to a>[...]

NTSB Prelim: Piper PA-28-180

Pilot Was Transporting His Family Back To Their Home In Boise And He Planned To Fly Back To SHR That Afternoon On September 1, 2025 about 1612 mountain daylight time, a Piper PA-28>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC