Final Assembly Underway On First GE9X Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Feb 11, 2016

Final Assembly Underway On First GE9X Engine

Will Enter Service In Four Years Aboard Boeing's 777X

Final assembly is well underway on the first full GE9X engine that will test in the first half of 2016, four years before the GE9X engine enters service on a Boeing 777X aircraft.

“Assembly of the first full GE9X engine is on track and coming together very nicely,” said Bill Millhaem, general manager of the GE90/GE9X engine programs at GE Aviation. “The GE9X team is extremely excited to see the engine design come to life and looks forward to watching it run soon on a test stand in Peebles, Ohio.“

The first engine to test (FETT) wraps up the extensive technology maturation program for the GE9X engine program, which began almost five years ago and has included component-level, system-level and core demo testing to validate the advanced technologies and materials in the new engine. FETT brings all the technologies together to demonstrate their operability as a complete propulsion system as well as provide early information on the engine’s aerodynamic and thermal characteristics.

Compared to prior engine development programs, the GE9X FETT is scheduled earlier in the development process, just a mere six months after the engine design was finalized. The second GE9X engine is scheduled to test in 2017 along with flight testing on GE Aviation’s flying test bed. This timing assures all learnings from FETT will be captured in all certification engines. Engine certification is anticipated in 2018.

With almost 700 GE9X engines on order, the GE9X engine will be in the 100,000 pound thrust class and will be the largest engine ever produced with a 134-inch diameter composite fan case and 16 fourth generation carbon fiber composite fan blades. Other key features include; a next-generation 27:1 pressure-ratio 11-stage high-pressure compressor; a third-generation TAPS III combustor for high efficiency and low emissions; and CMC material in the combustor and turbine.

IHI Corporation, Snecma and Techspace Aero (Safran), and MTU Aero Engines AG are participants in the GE9X engine program.

(Source: GE Aviation news release)

FMI: www.geaviation.com

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC