Boeing Reasserts It Will Keep To 787 Delivery Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Mon, Oct 08, 2007

Boeing Reasserts It Will Keep To 787 Delivery Schedule

Though Delays Will Require "Aggressive" Cert Program

The Dreamliner will deliver on-time. That's the word from Boeing, which on Monday reasserted its commitment to a May 2008 entry-into-service date for the upcoming composite-bodied airliner, despite growing delays in the program.

"It is still our objective to meet that May 2008 delivery but in doing that we have had to compress our flight-test schedule," said Boeing Commercial Airplanes VP Randy Tinseth to Reuters. "It is an aggressive schedule but we believe we can do it."

Even "Herculean" may not be a strong-enough term to describe the task before Boeing.

As ANN reported, flight of the first Boeing 787 prototype -- originally intended for August -- likely won't occur until mid-November at the earliest, due to supply issues with the specialized fasteners used to join the fuselage "barrel" sections, and headaches involving systems integration on the original plane.

Assembly on the next four planes to be used in the flight test program continues. Boeing will use six airframes in all, to accumulate the needed 1,300 flight hours and 3,700 ground-test hours needed for certification over six months, according to Tinseth, who spoke during a visit to Australia.

The first 787-8 is due to be delivered to All Nippon Airways.

FMI: www.boeing.com

Advertisement

More News

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Introduces New 45-watt Charging Ports for 14- and 2>[...]

ANN's Daily Aero-Term (10.15.25): En Route Automation System (EAS)

En Route Automation System (EAS) The complex integrated environment consisting of situation display systems, surveillance systems and flight data processing, remote devices, decisi>[...]

Aero-News: Quote of the Day (10.15.25)

“Our Kodiak aircraft family is uniquely designed to meet the rigorous demands of such deployments, bringing short takeoff and landing performance, robust cargo capacity and e>[...]

ANN's Daily Aero-Linx (10.15.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

NTSB Final Report: Jeremy S Lezin Just SuperSTOL

Left Main Landing Gear Struck A Bush, And The Right Wingtip Impacted The Ground Analysis: According to the pilot of the tailwheel-equipped airplane, he noticed that the engine oil >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC