ispace Announces Mission 1 Launch Date | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 20, 2022

ispace Announces Mission 1 Launch Date

Of Landings and Landers

ispace has announced the imminent launch of its Mission 1 (M1) lunar lander—part of the HAKUTO-R lunar exploration program.

The mission will depart Florida’s Cape Canaveral Space Force Station aboard a SpaceX Falcon 9 rocket on or about 28 November 2022.

M1 is a technology demonstration by which ispace seeks to validate its lander’s design, as well as the company’s business model—which consists primarily of providing reliable lunar transportation and data services.

Data and experience gleaned during the M1 mission will be applied to the design and operation of equipment germane to M2, which is presently in its developmental stage and slated for a 2024 launch. M2, in turn, will shape 2025’s Mission 3 (M3)—which will contribute a mature lander design and operational protocols to NASA’s Artemis Program under the agency’s Commercial Lunar Payload Services program.

M1’s primary landing site is the moon’s Atlas Crater, located at 47.5°N, 44.4°E, on the southeastern outer edge of Mare Frigoris (“Sea of Cold”). Site selection criteria included solar-illumination duration, communication visibility from the Earth, and the surrounding area’s compatibility with the M1 mission’s technical and scientific objectives.

The primary site is backed by multiple contingency sites to which the lander may divert in the event of malfunction or the manifestation of unforeseen variables during transit. Alternative landing sites include Lacus Somniorum, Sinus Iridium, and Oceanus Procellarum. Lunar touchdown is currently expected to occur in the latter part of April 2023.

ispace founder and CEO Takeshi Hakamada states: “Our first mission will lay the groundwork for unleashing the moon’s potential and transforming it into a robust and vibrant economic system. We look forward to contributing to NASA’s Artemis program as a commercial lunar transportation service and pioneering the development of future industries and connecting the Earth to the Moon and beyond.”

FMI: www.ispace-inc.com

Advertisement

More News

ANN's Daily Aero-Term (12.19.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

NTSB Prelim: Cirrus Design Corp SR22T

During The 7 Second Descent, There Was Another TAWS Alert At Which Time The Engine Remained At Full Power On October 24, 2025 at 2115 mountain daylight time, a Cirrus SR22T, N740TS>[...]

Classic Aero-TV: The Red Tail Project--Carrying the Torch of the Tuskegee Airmen

From 2009 (YouTube Edition): Educational Organization Aims to Inspire by Sharing Tuskegee Story Founding leader Don Hinz summarized the Red Tail Project’s mission in simple, >[...]

Aero-News: Quote of the Day (12.19.25)

“This feels like an important step since space travel for people with disabilities is still in its very early days... I’m so thankful and hope it inspires a change in m>[...]

Airborne 12.17.25: Skydiver Hooks Tail, Cooper Rotax Mount, NTSB v NDAA

Also: New Katanas, Kern County FD Training, IndiGo’s Botched Roster, MGen. Leavitt Named ERAU Dean The Australian Transportation Safety Bureau (ATSB) has wrapped up its inves>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC