AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Tue, Feb 08, 2022

AD: General Electric Company Turbofan Engines

AD 2021-26-22 Prompted By An Uncontained Failure Of An HPT Stage 2 Disk

The FAA is superseding Airworthiness Directive (AD) 2020-20-13 for certain General Electric Company (GE) CF6-80A and CF6-80C model turbofan engines.

AD 2020-20-13 required ultrasonic inspection (UI) of high-pressure turbine (HPT) stage 1 and stage 2 disks and replacement of any HPT stage 1 or stage 2 disk that fails the inspection. This AD was prompted by an uncontained failure of an HPT stage 2 disk and the manufacturer's subsequent determination to expand the population of affected HPT disks requiring UI inspection. This AD requires UI of HPT stage 1 and stage 2 disks and replacement of any HPT stage 1 or stage 2 disk that fails the inspection. This AD also expands the applicability to include an additional population of affected HPT stage 1 and 2 disks requiring UI inspection. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective March 14, 2022.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to supersede AD 2020-20-13, Amendment 39-21269 (85 FR 63193, October 7, 2020), (AD 2020-20-13). AD 2020-20-13 applied to certain GE CF6-80A, CF6-80A1, CF6-80A2, CF6-80A3, CF6-80C2A1, CF6-80C2A2, CF6-80C2A3, CF6-80C2A5, CF6-80C2A5F, CF6-80C2A8, CF6-80C2B1, CF6-80C2B1F, CF6-80C2B2, CF6-80C2B2F, CF6-80C2B4, CF6-80C2B4F, CF6-80C2B5F, CF6-80C2B6, CF6-80C2B6F, CF6-80C2B6FA, CF6-80C2B7F, CF6-80C2D1F, CF6-80C2L1F, and CF6-80C2K1F model turbofan engines. The NPRM published in the Federal Register on October 6, 2021 (86 FR 55545). The NPRM was prompted by an uncontained failure of an HPT stage 2 disk and the manufacturer's determination to expand the population of affected HPT disks requiring UI inspection.

After the FAA issued AD 2020-20-13, the manufacturer discovered an error in the service information and determined that the requirement to perform UI of affected HPT stage 1 and 2 disks should be expanded to include an additional population of HPT stage 1 and stage 2 disks. GE, therefore, revised its service information to include the additional affected HPT stage 1 and stage 2 disks. In the NPRM, the FAA proposed to continue to require UI of HPT stage 1 and stage 2 disks and replacement of any HPT stage 1 or stage 2 disk that fails the inspection. In the NPRM, the FAA also proposed to expand the applicability to include an additional population of affected HPT stage 1 and 2 disks.

FMI: www.regulations.gov

Advertisement

More News

Airborne 11.05.25: Tesla Flying Car?, Jepp/ForeFlight Sold, A220 Troubles

Also: AFE25 Tickets!, Jamaica Recovery, E-Aircraft at Boeing Fld, Diamond DA50 RG Cert Elon Musk is once again promising the impossible…this time, in the form of a Tesla tha>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

NTSB Prelim: Cirrus Design Corp SR22

While Descending Toward ASN, He Advanced The Throttle, But The Engine Did Not Respond On October 2, 2025, at 1126 central daylight time, a Cirrus SR22, N812SE, was substantially da>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC