Dreamliners Back In The Air | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Dec 25, 2010

Dreamliners Back In The Air

787 Flight Testing Resumes After Interim Solution Verified Through "Extensive Testing"

Boeing resumed flight test activities on the 787 Dreamliner Thursday. The company has installed an interim version of updated power distribution system software and conducted a "rigorous set of reviews" to confirm the flight readiness of ZA004, the first of the six flight test airplanes to return to flight.


Dreamliner ZA004

"Initially, we will resume a series of Boeing tests that remain to be completed in the flight test program. That testing will be followed later by a resumption of certification testing," said Scott Fancher, vice president and general manager of the 787 program. Today's testing will include an intentional deployment of the Ram Air Turbine (RAT), which is a small turbine that is deployed when back-up power is required.

Boeing and Hamilton Sundstrand completed testing of the interim software updates earlier this week. Verification of the system included laboratory testing of standalone components, integration testing with other systems, flight simulator testing and ground-based testing on a flight test airplane.

In the last several weeks, the company continued ground testing as part of the certification program. Additional ground testing will be done by the company on the production version of the airplane to further verify performance of the changes being made.

"As we return to flight test and determine the pace of that activity, we remain focused on developing a new program schedule," Fancher added. "We expect to complete our assessment of the program schedule in January."

Flight testing of the 787 was suspended last month following an in-flight electrical incident on a test flight in Laredo, Texas.

FMI: www.boeing.com

Advertisement

More News

TikToker Arrested After Landing His C182 in Antarctica

19-Year-Old Pilot Was Attempting to Fly Solo to All Seven Continents On his journey to become the first pilot to land solo on all seven continents, 19-year-old Ethan Guo has hit a >[...]

Classic Aero-TV: Versatile AND Practical - The All-Seeing Aeroprakt A-22 LSA

From 2017 (YouTube Edition): A Quality LSA For Well Under $100k… Aeroprakt unveiled its new LSA at the Deland Sport Aviation Showcase in November. Dennis Long, U.S. Importer>[...]

ANN's Daily Aero-Term (06.27.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (06.27.25)

Aero Linx: Historic Aircraft Association (HAA) The Historic Aircraft Association (HAA) was founded in 1979 with the aim of furthering the safe flying of historic aircraft in the UK>[...]

Aero-News: Quote of the Day (06.27.25)

"We would like to remember Liam not just for the way he left this world, but for how he lived in it... Liam was fearless, not necessarily because he wasn't afraid but because he re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC