DOD Details VXX Work Split Locations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sun, Jan 30, 2005

DOD Details VXX Work Split Locations

Over A Third Of The Work To Be Performed Outside The United States

The Department of Defense has issued a statement detailing the amount of work that will be performed on the Lockheed-Martin VXX presidential helicopter replacement, by city, state and country.

The Systems Development and Demonstration phase of the contract, which ANN previously reported totalled just under $1.8 billion, consists of engineering design and integration work for the myriad communications, navigation and mission systems required to perform the support mission for the President of the United States.

The phase also includes a comprehensive test and evaluation program, and production of five aircraft to introduce the operational capability. The locations where the SDD work will be performed, and the percentage of work assigned to each, are:

  • Owego (NY), 31 percent
  • Amarillo (TX), 27 percent
  • Yeovil, United Kingdom, 21 percent
  • Agusta, Cascina Costa, Italy, 15 percent
  • Lynn (MA), 3 percent
  • Rancho Santa Margarita (CA), 1 percent
  • Grand Rapids (MI), 1 percent
  • Denton (TX), 1 percent

The SDD phase is expected to be completed by September 2011, and the contract funds for the program will not expire at the end of this fiscal year. The contracting activity for this program is the Naval Air Systems Command, Patuxent River (MD).

FMI: www.dod.gov

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, Nat’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

Klyde Morris (06.30.25)

What Goes Around, May Yet Come Back Around, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC