First P-8A Poseidon In-Flight Mission Systems Tests Successfully Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Jun 18, 2010

First P-8A Poseidon In-Flight Mission Systems Tests Successfully Completed

Three-Hour Flight Tested All Operator Workstations

P-8A Poseidon aircraft T2 successfully completed the program's first mission systems test flight on June 8 in Seattle, Boeing announced Thursday. T2 will be used to verify integrated mission systems performance during flights in Seattle and at Naval Air Station Patuxent River, MD.


P-8 Poseidon T2 File Photo

During the three-hour flight, the joint Boeing and Navy test team exercised mission computing on all five operator workstations and successfully demonstrated key systems -- including acoustics, mission planning, tactical data-link, communications, electronic support measures and flight test instrumentation -- for the first time.

"This successful flight moves us a step closer to getting the Poseidon and its next-generation radar and sensors into the hands of the warfighter," said Chuck Dabundo, Boeing vice president and P-8 program manager. "Future flights will demonstrate the state-of-the-art systems that will provide the Navy superior performance well into the 21st century."


P-8 Poseidon File Photo

T2 is one of five test aircraft that are being assembled and tested as part of the U.S. Navy System Development and Demonstration contract Boeing received in 2004. Boeing's T1 airworthiness-test aircraft entered flight testing in October 2009 and arrived at the Navy's Patuxent River facility in April 2010.

The Navy plans to purchase 117 P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013.

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, Nat’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

Klyde Morris (06.30.25)

What Goes Around, May Yet Come Back Around, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC