Tue, Mar 26, 2013
SN 003 Will Be Used For Avionics, Noise, Electrical Testing
The third prototype of the midsize Legacy 500 business jet has made its first flight, according to officials from Embraer Executive Jets. “With the first two prototypes already well into the flight test program, the first flight of the third Legacy 500 is a major milestone for the program,” said Ernest Edwards, President, Embraer Executive Jets. “The four-aircraft test program is designed to ensure all systems and features on the Legacy 500 reach maturity before entering service. The first and second prototypes already have logged 122 hours on 66 flights with testing proceeding as anticipated.”

After being rolled out on February 25, the Legacy 500 SN 003 is being used to test avionics, noise, electrical systems and the interior. Testing the interior to ensure a smooth EIS is key to the success of the program because it allows the company to test for failures and address problems before service entry, confirming the Company’s dedication to delivering an unmatched customer experience.
To that end, Embraer Executive Jets took the unusual step of producing an interior rig using an actual metallic fuselage equipped with the complete interior. The goal is to gain maturity in terms of assembly and to take managers and engineers on virtual flights between two and six hours to test comfort, reliability and durability. The interiors rig underwent rigorous testing of the seats, the galley as well as the lavatory. The company also had test results validated by outside labs.
The maturity campaign included more than 13,000 hours on the Legacy 500 Iron Bird since it entered service in 2010. The Iron Bird is used to test and re-test the aircraft at each development phase and integrates all systems including air management, avionics, power plant, electrical systems, flight controls, specific fly-by-wire control law tests, synoptics and CAS messages tests as well as failure mode case analysis tests.
In addition, during the maturity campaign each of the prototypes will have all maintenance reports uploaded into the Aircraft Health Analysis and Diagnosis (AHEAD) system which collects maintenance data for more efficient, thorough and easier maintenance planning. The computational, web-based maintenance platform is designed to ensure maximum readiness by limiting down time. Once in service with customers, AHEAD accelerates fault identification, allowing maintenance technicians to plan troubleshooting responses while the aircraft is still in flight.
(Image provided by Embraer)
More News
From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]
Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]
Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]
Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]
"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]