Northrop Grumman Responds To GPS III Space Vehicle Alternatives Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Apr 11, 2016

Northrop Grumman Responds To GPS III Space Vehicle Alternatives Program

US Air Force Request Portends New Era In GPS Resiliency And Affordability

Northrop Grumman Corporation has submitted an innovative proposal to the United States Air Force for the next-generation Global Positioning System (GPS) III program. The Air Force is looking to update the GPS system, which has been delivering precise global position, navigation and timing services worldwide for more than two decades.

Northrop Grumman's proposal is based on a navigational payload prototype built and tested in 2015 and a heritage space vehicle, proven to operate in the harsh environment of medium earth orbit. In addition to current GPS III capabilities, the company's payload demonstrated enhanced transmission power for the military code, a critical capability for operating in regions of the world where jamming is prevalent.

"The Air Force plans to develop a new generation of GPS space vehicles that will deliver the advanced capabilities needed by military and civil users, while countering the future threat environment," said Tim Frei, vice president, communications systems, Northrop Grumman Aerospace Systems. "Our producible and resilient payload prototype meets these requirements. We are ready to bring this capability to the warfighter."

The Air Force plans to award up to three $5 million study contracts in the third quarter of 2016, under the GPS III Space Vehicles 11+Phase 1 Production Readiness Feasibility Assessment request for proposal. The study contracts will run for 26 months, with two additional six-month options. A competition for 22 spacecraft is anticipated in 2018.

(Source: Northrop Grumman news release. Image from file)

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC