Reliable Production Key To F-22 Success | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Sep 20, 2004

Reliable Production Key To F-22 Success

Lockheed-Martin Calls Program Healthy, On Track

The Raptor industry team has reached a new level of program maturity with reliable production, solid performance and expanding capabilities, Lockheed Martin's Deputy Vice President for Business Development Rob Weiss said last week.

Speaking to reporters at the 2004 Air Force Association National Conference, Weiss said the F/A-22 program is healthy, solid and on track. He added that significant advances in production have been made over the past year, and aircraft committed for delivery in 2004 are completing production build according to schedule.

"We are delivering high-quality aircraft faster than ever before, meeting our 2004 commitment to the Air Force, and we have begun the initial stages of Raptor modernization," Weiss said. "We are excited that the Air Force's operational testing is nearing completion and look forward to a full-rate production decision."

F/A-22 modernization is a robust, long-term plan to inject emerging technologies and expand capabilities.

Weiss pointed out that the F/A-22's performance is exceeding requirements in key areas such as stealth, speed, agility and sensor systems performance at Edwards, Nellis and Tyndall Air Force bases, routinely demonstrating the Raptor's transformational war fighting capabilities.

The Air Force began F/A-22 Initial Operational Test and Evaluation (IOT&E) in late April 2004, and all indications are that IOT&E is proceeding well, although it is not expected to be complete until later this year. According to the Air Force, all scenarios scheduled to be flown are complete.

"In addition to evaluating data gathered during flight scenarios, the Air Force will use modeling and simulation tools to simulate flying operations and maintenance. The Air Combat Simulator in Marietta, Georgia, is being used for the Modeling and Simulation portion of IOT&E," Weiss said.

"The F/A-22 program is concluding development, ramping up for full-rate production and delivering superior jets to the Air Force," he said. "All the while we are working closely with the Air Combat Command to craft a prudent modernization 'flight plan' that will keep the Raptor on the cutting edge of survivability and lethality for decades to come."

FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC