Dreamliner Test-Flying Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Jan 19, 2011

Dreamliner Test-Flying Again

Flight Testing Resumed Monday Following November Electrical Fire

The first Dreamliner flight test since an electrical panel on ZA002 caught fire in November occurred Monday. ZA004 took off from Yuma, AZ on a flight to show that the aircraft could safely jettison fuel, which would be required before an emergency landing.


ZA004 File Photo

The resumption of FAA certification flights means Boeing can now work on firming up a revised delivery schedule. Delivery dates had been pushed back again after testing was cancelled. Commercial Airplanes chief Jim Albaugh told The Seattle Times that the company would not release a schedule until the FAA makes a determination about what modifications need to be made to the panel.

Attention is now focusing on debris in the panel which may have caused the fire, and the series of systems failures that followed. One of those was the loss of the primary flight displays in the cockpit.  Boeing has identified some "minor" hardware modifications that will prevent debris from getting to the panel, and some more extensive software changes to help the Dreamliner's electrical system cope more effectively to a failure in a single panel.


ZA002

There is also some speculation that the FAA will stiffen the certification standards following the fire, and an unrelated incident involving a Rolls-Royce engine on a Qantas A380 late last year. That would also have an effect on the delivery date.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC