Red Tails Performing Maintenance On P-51 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sat, Jan 10, 2015

Red Tails Performing Maintenance On P-51

Some Major Items Discovered To Be In Need Of Repair

The CAF Redtail Squadron got some bad news when its P-51C Mustang Tuskegee Airmen went in for some routine maintenance. The squadron reports on its blog that the airplane is in need of some major work that will ground the airplane until is it repaired.

According to the blog, the  radiator, one of the legs of the landing gear, a piston ring and damage to the aileron cables are all on the docket for repair, along with the Mustang’s regularly-schedule maintenance. Although none of these needs indicate a life-threatening problem to the aircraft, they certainly are very expensive and need to be attended to before it can be flown again.

Tye Halvas and the team at AirCorps Aviation are giving us the inside scoop on the maintenance and repair, and we are going to keep you updated with regular posts and pictures to follow along with the process. Keep your eyes on this blog for updates!

Current work in progress:

Engine – The banks and pistons are at Roush Aviation and will be done the first week of February. Right now they are in the disassembly and inspection process.

Landing gear – The pivot shafts are getting magnafluxed and cadmium plated. They are expected back January 13th. At that point that landing gear will be reassembled, serviced with fluid and nitrogen and installed in the aircraft.

Horizontal stabilizer – The patch has been completed and the paint process is done though primer. As soon as the landing gear is in and the aircraft is back on the ground it will be painted red.

Radiator – The radiator has been cleaned and inspected. Repairs have been made to the solder and the core is currently being tested.

The squadron said it will continue to post updates on the progress of the repairs as they are made.

(Image provided by the CAF. Mechanic Brian Bottolene works to hoist the right bank off of the engine)

FMI: www.redtail.org

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC