Loyal Wingman UAV Conducts First High-Speed Taxi Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Dec 24, 2020

Loyal Wingman UAV Conducts First High-Speed Taxi Test

Will Resume Final Taxi Tests And Preparations For Flight In Early 2021

The Royal Australian Air Force (RAAF) has completed the first high-speed taxi test of the Loyal Wingman in preparation for first flight.

Boeing test personnel monitored the aircraft’s performance and instrumentation from a ground control station to verify the functionality while the vehicle reached accelerated speeds. The uncrewed aircraft has been undergoing low-, medium-, and high-speed taxi testing at a remote test location in Australia.

“Our test program is progressing well, and we are happy with the ground test data we have collected to date,” said Paul Ryder, Boeing Flight Test manager. “We are working with the Air Warfare Centre to complete final test verifications to prepare for flight testing in the new year.”

Boeing and the Royal Australian Air Force will resume final taxi tests and preparations for flight in early 2021 when the range reopens.

RAAF Head of Air Force Capability Air Vice-Marshal Cath Roberts said seeing the aircraft in person during the December trials had been extraordinary.

“There is something very special about testing an aircraft that takes technology to the next level. It is iconic in its own way,” said Roberts. “Experiencing the enthusiasm of the Boeing and Air Force team reminded me of my early career testing aircraft.”

“This is what innovation is all about – working together to achieve many firsts,” she said.

More than 35 Australian suppliers on the Australian industry team have contributed to the aircraft development, including investment partner BAE Systems Australia, which has been embedded with the Boeing test team on-site.

“In the past year alone, we have made amazing strides on this aircraft, taking it from a fuselage to a finished aircraft that has undergone rigorous testing,” said Dr. Shane Arnott, program director of the Boeing Airpower Teaming System.

“Our focus now is on conducting a safe and secure flight-test regimen for the Loyal Wingman program.”

FMI: www.boeing.com/defense/airpower-teaming-system

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC