Boeing Completes First Wedgetail Aerial Refuelings | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jan 20, 2009

Boeing Completes First Wedgetail Aerial Refuelings

First Time A 737 Has Been Fueled In-Flight

Boeing recently announced some much-needed good news regarding its delayed 737 "Wedgetail" program for Australia's air force. The company has completed the first aerial refuelings of the platform.

Flying at 25,000 feet above Edwards Air Force Base, CA on January 7, Boeing pilot Ron Johnston maneuvered the 737-700 AEW&C aircraft into a US Air Force KC-10 tanker's refueling boom envelope and maintained its position below the tanker. The 737 received approximately 14,000 pounds of fuel during two connections with the tanker.

"The aircraft was stable, with excellent flying qualities and engine response behind the tanker," said Johnston.

The historic flights -- the first-ever inflight refueling of a 737-based plane -- were conducted for Project Wedgetail, Australia's airborne early warning and control (AEW&C) program. The aircraft achieved another aerial-refueling first on January 10, when it received fuel from an Air Force KC-135 tanker.

"The 737 AEW&C aircraft's highly automated and efficient refueling system worked flawlessly in both tests," said Maureen Dougherty, AEW&C Program vice president for Boeing. "This is a key milestone in certifying the AEW&C system.

"Air-to-air refueling is a force multiplier for the AEW&C aircraft," Dougherty added, "allowing it to stay on station for significantly longer periods of time while providing critical battle-management and surveillance capabilities."

Project Wedgetail includes six 737 AEW&C aircraft plus ground support segments for mission crew training, mission support and system. ANN reported in November 2008 that Boeing has announced Australia won't see its first modified plane until later this year... three years behind schedule.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC