AD: Viking Air Limited Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Sep 28, 2018

AD: Viking Air Limited Airplanes

AD NUMBER: 2018-19-11

PRODUCT: All Viking Air Limited Models DHC-2 Mk. I, DHC-2 Mk. II, and DHC-2 Mk. III airplanes.

ACTION: Final Rule.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as cracking found in the wing rear spar web at the wing station where the flap outboard hinge is attached.

DATES: This AD is effective October 30, 2018.

COST: The FAA estimates that this AD will affect 140 products of U.S. registry. The cost of compliance is estimated as follows: The FAA estimates that it will take about 11 work-hours per product to comply with the basic inspection requirements of this AD. The average labor rate is $85 per work-hour.
Based on these figures, the estimated basic cost of this AD on U.S. operators to be $130,900, or $935 per product. Reporting the inspection findings would require about 5 minutes, for a cost of $7 per airplane and $980 for the U.S. operator fleet.
In addition, the following is an estimate of possible necessary follow-on replacement actions. The FAA has no way of determining the number of products that may need these actions.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC