NTSB Issues Urgent Safety Recommendation On Sikorsky S-76 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Nov 19, 2005

NTSB Issues Urgent Safety Recommendation On Sikorsky S-76

Recommends FAA Require Checks Into MRA Internal Leakage

The National Transportation Safety Board (NTSB) has issued two recommendations that the FAA immediately require Sikorsky S-76 operators conduct immediate checks into leakage in the internal assemblies of the helicopters' main rotor actuators.

The NTSB's specific recommendations are as follows:

(Urgent A-05-33)

  1. Conduct an immediate internal leakage test of all main rotor actuators with more than 500 hours since new and/or overhaul;
  2. Conduct subsequent recurring tests at a period not to exceed 500 hours;
  3. Report the test results to the Federal Aviation Administration and/or Sikorsky; and
  4. Correct any problems as necessary.

(Urgent A-05-35)

The NTSB recommends the FAA require Sikorsky S-76 helicopter operators to:

  1. Conduct immediate visual and laboratory examinations of hydraulic fluid and filter elements in hydraulic systems with actuators with more than 500 hours since new and/or overhaul for plasma flakes or other contamination that exceeds the manufacturers' allowable limits of concentration and size;
  2. Conduct subsequent recurring tests at a period not to exceed 500 hours;
  3. Report findings of contamination and flakes to the Federal Aviation Administration and/or Sikorsky and
  4. Correct any problems as necessary.

The NTSB also recommends the FAA direct the principal operations inspectors of all Sikorsky S-76 helicopter operators to reemphasize the importance of, and requirement for, a preflight check of control movement smoothness and flight control 'stick-jump' at every engine start.

FMI: View the complete recommendation letter (PDF)

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC