Increased Operational Capabilities Finalized For Eurofighter Typhoon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Nov 01, 2013

Increased Operational Capabilities Finalized For Eurofighter Typhoon

Cassidian Has Successfully Finalized Phase 1 Enhancements Tests

Cassidian, the defense division of EADS, has successfully finalized its flight testing of the Eurofighter Typhoon Phase 1 Enhancements (P1E) program. After an intensive test program of this First Batch of Enhancements on Instrumented Production Aircraft 4 and 7,  this enhancement is confirmed to deliver a robust simultaneous multi-/swing-role capability to the Nations' Air Forces. It will be ready for the customers by the end of 2013.

The testing took place at Cassidian´s Military Air Systems Centers in Manching/Germany and Getafe/Spain, in cooperation with BAE Systems and Alenia Aermacchi. "The Phase 1 Enhancements will provide a significant leap in Eurofighter's operational capabilities. Deploying multiple weapons with attack constraints simultaneously in all weather has never been easier", said Chris Worning, Cassidians Eurofighter Project pilot.

P1E implements full Air-to-Surface capability on Eurofighter Typhoon - including Laser Designator Pod -, full smart bomb integration, modern secure Identification Friend or Foe (Mode 5), improved Radios and Direct Voice Input, Air-to-Surface Helmet Mounted Sight System, improved Air-to-Air capabilities including digital integration of Short Range Air-to-Air Missiles and updated MIDS (Multifunctional Information Distribution System) Datalink functionalities for enhanced interoperability with Coalition Forces.
 
The Enhancements cover the design, development, qualification and clearance of the first major upgrade after the Main Development Contract. It is a major milestone in the development of Eurofighter Typhoon giving seamless air-to-ground integration to the weapon system and forming the baseline for further enhancements such as AESA (Active Electronically Scanned Array) radar and Meteor missile.

(Image provided by Cassidian)

FMI: www.cassidian.com

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC