Interruption Of The VA239 Countdown: Results Of Preliminary Analysis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Sep 08, 2017

Interruption Of The VA239 Countdown: Results Of Preliminary Analysis

New Launch Date Likely Not Until The End Of September

Just after the ignition of Ariane 5’s main stage Vulcain engine, the on-board computer detected an anomaly affecting electrical equipment on one of the two solid-propellant boosters (EAP). This anomaly led to an interruption of the automated lift-off sequence.

This interruption is perfectly compliant with our procedures which authorize a launch only if 100% of launcher equipment is fully operational. This rule guarantees the reliability and robustness of our launch system.

An analysis started immediately after the countdown interruption. It will continue to identify the anomaly’s cause and determine the measures to be taken in order to resume launch operations as soon as possible.

As the analysis is underway, Ariane 5 was transferred to the Final Assembly Building (BAF) on Thursday, September 7, once the tanks were purged. The two satellites, Intelsat 37e and BSAT-4a, are safe under the fairing atop the launcher.

As soon as the analysis of the anomaly has been completed, Arianespace will announce a new launch date. The objective is to launch around the end of September 2017.

This postponement does not affect the other launches scheduled for the end of 2017.

(Source: Arianespace news release. Image from file)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC