That Was A Little Short | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jul 06, 2004

That Was A Little Short

Abbreviated Burn Leaves Satellite In Too-Low Orbit

The Sea Launch team is gathering and reviewing Telstar 18 mission data to understand the sequence of events that led to a premature shutdown of the Sea Launch Zenit-3SL upper stage during that mission earlier this week.

The Zenit-3SL launch vehicle lifted off from the equatorial launch site on June 28 at 8:59 pm PDT, (3:59 GMT, June 29) as scheduled, deploying Loral's Telstar 18 communications satellite into orbit with a separated mass of 4,640 kg (10,229 lbs.). Based on preliminary flight data, all Sea Launch system flight parameters were nominal except that the upper stage of the launch vehicle shut down about 54 seconds prematurely, following the second of two planned burns of the upper stage. The early shutdown caused the satellite to be released into an orbit with an apogee of 21,605 km, some 14,000 km short of the 35,786 km target apogee.

Space Systems/Loral confirmed spacecraft signal acquisition by a ground station in Perth, Australia, soon after separation and reported that the satellite was operating normally. Loral Space & Communications has replanned the mission and, if successful, the satellite has sufficient on-board fuel to bring it to its final orbital position and meet or exceed its 13-year specified life. Loral also reported the Telstar 18 spacecraft has deployed its solar arrays and all systems on the spacecraft are functioning as designed.

The cause of the rocket's upper stage premature shutdown is under investigation by an Energia-appointed commission. Sea Launch will also form an independent review board to evaluate all findings and confirm that any corrective actions associated with the upper stage performance on the Telstar 18 mission are complete, satisfactory and verified. At this point in time, Sea Launch is optimistic it will conclude the board's investigation and complete two more launches this year, as originally planned. Sea Launch remains highly confident in the robust capability of the Zenit-3SL system, including the upper stage. This component remains one of the premiere upper stages in the industry, with an overall success rate of approximately 97%.

FMI: www.sea-launch.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC