NASA Continues Orion Parachute Testing For Future Test Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Apr 19, 2012

NASA Continues Orion Parachute Testing For Future Test Flight

Agency Targets 2014 For First Orion Test Flight

NASA successfully conducted a drop test of the Orion crew vehicle's entry, descent and landing parachutes high above the Arizona desert Tuesday in preparation for the vehicle's orbital flight test, Exploration Flight Test -1, in 2014.

A C-130 plane dropped a dart-shaped test vehicle with a simulated Orion parachute compartment from an altitude of 25,000 feet above the U.S. Army's Yuma Proving Grounds. Orion's drogue chutes were deployed at 20,000 feet, followed by the pilot parachutes, which then deployed the main landing parachutes. The test vehicle landed on the desert floor at a speed of almost 25 feet per second, well below the maximum designed touchdown speed of the spacecraft.

This particular drop test had two primary objectives. The first determined how the entire system would respond if one of the three main parachutes inflated too quickly, which occurs if a reefing stage, which helps the parachutes open gradually, is skipped. The second objective was to validate the drogue parachute design by testing at a high dynamic pressure that closely mimicked the environments expected for Exploration Flight Test-1. This test flight, scheduled for 2014, is designed to test a number of Orion's systems, including the avionics, navigation and thermal protection systems and will send Orion more than 3,000 miles into space.

Since 2007, the Orion program has conducted a vigorous parachute air and ground test program and provided the chutes for NASA's successful pad abort test in 2010. The tests improve understanding about the chutes' technical performance for eventual human-rated certification. The next parachute test will be conducted this summer. (Image provided by NASA)

FMI: www.nasa.gov/orion

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC