New Center Taxiway Completed At LAX | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Jun 28, 2008

New Center Taxiway Completed At LAX

FAA Celebrates Step In Renovation Project

The Federal Aviation Administration and the City of Los Angeles marked the completion of a $333 million renovation of the south airfield at Los Angeles International Airport (LAX) at a ceremony held June 24. The renovation included the construction of a new center taxiway that runs between the airfield's two parallel runways.

The FAA says completion of the taxiway effectively eliminates the main cause of serious runway incidents between runways 7L/25R and 7R/25L.

Before the center taxiway was installed, aircraft that landed on the outer runway would exit on high-speed taxiways that led directly to the inner runway. A number of serious runway incursions occurred when arriving aircraft maneuvered too close to -- or onto -- the inner runway in front of departing aircraft.

The new center taxiway eliminates the direct path arriving planes had to the inner runway, greatly reducing the chances of conflict with departing aircraft. Now, arriving aircraft have to significantly slow down and make sharp left turns onto the center taxiway before turning again onto other taxiways that lead to the gate areas.

Controllers began using completed stretches of the taxiway last year, and since portions of the center taxiway began to be used last August, there hasn't been a single incident on the south airfield.

Phase one of the south airfield project began in June 2006, and involved moving the southernmost runway 55 feet to the south in order to make room for the center taxiway. That relocation was completed in April 2007, when construction on the center taxiway began. FAA contributed nearly $100 million in grants to support the renovation project.

Several other runway safety improvement programs are underway at LAX, including the installation of runway status lights and ASDE-X. Under the runway status lights program, a series of red lights are embedded in the runway pavement to warn pilots if it is unsafe to cross or enter a runway. ASDE-X provides controllers with ground surveillance data collected from a variety of sources, including traditional radar, ADS-B, and aircraft transponders. Both systems are expected to be operational next year.

"Each of these upgrades adds a layer of safety that benefits every one of the 61 million-plus passengers who fly through here each year," stated Wes Timmons, FAA's Director of Runway Safety. "Taken together, these upgrades will go a long way in making this safe airport even safer."

FMI: www.lawa.org, www.faa.gov

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC