Will Shuttle Fuel Tank Glitch Bump Discovery's Launch? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 09, 2006

Will Shuttle Fuel Tank Glitch Bump Discovery's Launch?

Same Problem Cropped Up Last Year

Last week, Aero-News reported on NASA's tight schedule for launching three shuttle missions this year. The slightest glitch could throw that schedule off, NASA said at the time... and now, it appears such a glitch may have occurred.

The trouble is with the shuttle Discovery's problematic external fuel tank. A critical fuel-depletion sensor, once known as an emergency cutoff sensor, is giving unusual readings, NASA engineers said Tuesday.

NBC news reports it's the same type of problem that plagued the countdown of Discovery's "Return to Flight" launch last July. Scientists ultimately decided to launch then, despite the intermittent problem.

It's not known yet if the problem sensor -- which displayed what one scientist described as "a very slight shift" during electrical tests -- will need to be replaced this time around. It is also not known how the problem might affect Discovery's scheduled May 10 launch window.

Should engineers decide the problem sensor needs to be replaced, one anonymous source told NBC News the job might require no more than an additional week of work -- leaving the door open for a possible launch between May 17-23. But others say it could take much more time.

Even if the scheduled May launch is delayed until July, NASA says it is possible they could still fly two more missions after before the end of 2006.

That schedule would rely on EVERYTHING going right, though... and so far, the fuel sensor isn't the only issue causing some grief for engineers working to ready Discovery for launch.

While maneuvering a boom-mounted platform in the Vehicle Assembly Building to clean up debris caused by a broken ceiling lamp this week, workers accidentally caught the shuttle's robot arm with the edge of the platform. The arm was stowed in its position along the left side of the shuttle's payload bay.

Inspections are now underway to make sure the arm suffered no mechanical damage. As workers slave to meet NASA's admittedly tight schedule, sources told NBC, such operator errors have become more common of late... as workers pull double shifts.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC