Boeing 787-9 Testing In Australia Could Shorten 787-10 Time To Market | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jan 16, 2014

Boeing 787-9 Testing In Australia Could Shorten 787-10 Time To Market

Hot Weather Testing Could Be Applied To Yet-To-Be-Built Larger Airplane

Some of the testing being done on a Boeing 787-9 in Australia to determine how the airplane will deal with extremely hot conditions could be germane to the 787-10, according to Boeing engineers.

The Australian Business Traveler reports that, even though the -10 variant of the Dreamliner is still in the design phase, Lead Flight Test Engineer Dominic Thacker said that they are "actually picking up some -10 testing on this configuration."

Thacker said that some of the systems will be similar enough that the testing will be applicable to the larger variant. "If we can do some of those tests in advance on a similar airplane it helps us downstream and will save us time later," he said.

Boeing's Test Operations Manager for the 787-9 program Ryan Smith said the tests being conducted on the -9 variant are derivatives of tests what were conducted with the -8 Dreamliner. "This is just a subset of what a major model needs to go through," he said. "We've flown the -9 into testing very, very quickly," he said.

The 787-10 will be larger than the -9, and carry 330 or more passengers depending on its configuration, according to Boeing, but it will not have the range of the two smaller models. Boeing says that is balanced by maximizing the seat miles the airplane will be able to fly.

(787-9 image from file)

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC