Astronauts Complete Second STS-119 Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Mar 22, 2009

Astronauts Complete Second STS-119 Spacewalk

Wrong-Way Pin Leads To Complications

Astronauts Steve Swanson and Joseph Acaba ended the second spacewalk of the STS-119 mission to the International Space Station at 7:21 pm EDT Saturday. They prepared a worksite so the STS-127 spacewalkers can more easily change out the Port 6 truss batteries later this year.

On the Japanese Kibo laboratory, Swanson and Acaba installed a second Global Positioning Satellite antenna that will be used for the planned rendezvous of the Japanese HTV cargo ship in September. They also photographed areas of radiator panels extended from the Port 1 and Starboard 1 trusses and reconfigured connectors at a patch panel on the Zenith 1 truss that power Control Moment Gyroscopes.

There was one rather significant glitch during the spacewalk... and it was due to human error. The Associated Press reports Acaba accidentally inserted a pin upside down, jamming the deployment of an equipment storage platform outside Kibo.

After struggling with the balky pin, the spacewalkers tied off the unpressurized cargo carrier attachment system (UCCAS) in hopes engineers on the ground will determine a way to free the stuck pin during Monday's third and final spacewalk.

"Even with it being installed in the opposite location, he just drew a card of bad luck ... if it had been rotated just a little bit more or maybe a little bit less, it might have cleared just fine," Glenda Laws-Brown, STS-119 Lead Extravehicular Activity Officer, said Saturday evening.

"Some days you're lucky, and some days you're less lucky," she added, also noting there is no "up" and "down" in space... which makes the error easy to understand. Nevertheless, time spent trying to solve the pin issue meant other items on the agenda were bumped to Monday's excursion.

A second, more dramatic -- but ultimately less significant -- problem occured near the end of the six hour, 30-minute spacewalk. Due to Acaba's and Swanson's movements at the end of the station's truss assembly, the onboard gyros that maintain the station's attitude in orbit overheated, triggering an alarm.

The problem was "nothing to worry about," Mission Control stated, and the docked shuttle Discovery briefly assumed control of maintaining the station's orbital attitude while the gyroscopes cooled.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC