SJ30 Passes Icing Test With Flying Colors | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Mar 07, 2006

SJ30 Passes Icing Test With Flying Colors

One Test Remains Before Start Of Customer Deliveries

Sino Swearingen Aircraft Corporation (SSAC) announced Monday the company's SJ30-2 business jet successfully completed its final flight test into actual icing conditions last week. The test, conducted March 1 in Provo, UT, consisted of the FAA requirement to complete a 45-minute hold in actual maximum continuous icing conditions. The test flight was flown by pilots Mark Fairchild and John Siemens, and Flight Test Engineer Schuyler Horn.

The SJ30 -- which received its FAA type-certification last October -- is equipped with electrically heated windshields and uses engine bleed air heat to anti-ice the wings and engines. Pneumatic boots are used to de-ice the horizontal tail. The approval flight involved 50 minutes of maximum continuous icing conditions and more than another hour of intermittent icing conditions, which resulted in a build up of over 4 inches of ice on unprotected areas of the aircraft.

"The airplane performed remarkably well in the extreme icing conditions we encountered," Siemens said. "It is also my opinion that the SJ30 performed better in the ice than any other airplane I have previously certified for flight in known icing conditions... the flight characteristics and handling qualities were very good with this residual ice accumulation."

"In the post flight debriefing, the flight test crew all agreed that the SJ30 is one of the safest airplanes on the market today when it comes to flying in icing conditions," Siemens added.

Last month, Siemens and other members of the flight test crew completed artificial ice shapes testing at Roswell, NM. This testing is required to demonstrate aircraft handling characteristics -- including stability, control, and stall characteristics -- with simulated ice attached to the airframe, replicating what would accumulate on unprotected surfaces during flight in a 45-minute maximum continuous ice encounter.

With the successful completion of the icing tests, the only hurdle remaining for Sino Swearingen before the company can begin customer deliveries is the FAA's sign-off on the bizjet's interior, which is expected shortly.

FMI: www.SJ30Jet.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC