Associated Air Center Delivers First Airbus A330-200 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Oct 06, 2014

Associated Air Center Delivers First Airbus A330-200

Airplane Represents Fifth Overall Wide-Body Completion Project

Associated Air Center (AAC), has delivered its first green Airbus A330-200 VVIP wide-body aircraft completion project for a prominent customer. The project included a full cabin (nose-to-tail) customization equipped with high speed data, high definition In-Flight Entertainment (IFE), a comprehensive sound insulation package, stand-up shower, full cooking and food preparation, forward and aft galleys and complete interior zonal drier and humidification system. The end customer took delivery of the aircraft from AAC’s Dallas Hangar and departed via Love Field on September 23.

In its more than 66 years of operations, AAC has performed dozens of narrow-body projects as well as four wide-body Boeing 747 and 767 projects. This was the first Airbus wide-body project completed by the company and the fifth overall. AAC’s re-emergence into the wide-body VVIP market has been strong for the past three years and currently the company is working on both a 747-8 program and its first 787 completion in Dallas. Even with the two wide-body aircraft in its facilities, AAC has plenty of capacity to take on additional projects, including narrow and wide-body completions as well as maintenance, repair and overhaul services.

“The A330-200 was a very large and complex completion program,” said James Colleary, President of AAC. “As part of the process, we added staff and expanded our current facilities to accommodate this and future wide-bodies. There were many engineering challenges and customer revisions throughout the process but our employees delivered and we have returned a safe and beautiful aircraft to a very happy customer.”

FMI: http://associated.aero/

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC