New Date Set For Full-Scale NASA/ATK Ares I Solid Rocket Motor Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Sep 07, 2009

New Date Set For Full-Scale NASA/ATK Ares I Solid Rocket Motor Test

First Ground Test of the Ares I Five-Segment Solid Rocket Motor Re-Sked

Alliant Techsystems Space Systems and NASA have finally identified the issue that resulted in the scrub of last week's test of the Ares 1 solid rocket motor system. A component of the ground controller unit, which sends power to the system that moves the nozzle during the test, failed and has been replaced.

The test has been rescheduled for Thursday, Sept. 10. Final testing of the ground system has continued over the weekend and early next week. The current schedule calls for the test to go off at 1300 MDT, at the ATK Space Systems facility in Promontory, Utah.

Test Objectives:

  • A total of 46 design objectives will be measured through 650 instrument channels
  • The Ares I design is based on the design of the space shuttle's four-segment booster
  • The addition of the fifth segment will increase the maximum thrust performance to approximately 3.6 million pounds
  • The first stage of Ares I has been under development since 2005. It measures 12 feet in diameter and 154 feet in length
  • The cases have all previously flown on the space shuttle, collectively launching on 48 missions--including STS-1

If you happen to live locally, a public viewing area is available along State Road 83 North approximately 20 miles west of Corinne, Utah.

FMI: www.atk.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC