ATK Awarded Composite Components Contract For The Boeing Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jan 22, 2014

ATK Awarded Composite Components Contract For The Boeing Dreamliner

Will Produce Substructural Composite Components For The 787 Beginning Immediately

ATK has been selected by Boeing for a contract, beginning immediately, to produce substructural composite components for the Boeing 787 Dreamliner.

"This is a great win for ATK that builds on our commitment and proven success of providing affordable innovation and customer satisfaction," said Blake Larson, president of ATK Aerospace Group. "This work scope adds to our long-term relationship of supporting Boeing with composite structures spanning many dynamic products across the commercial aircraft, military aircraft, launch vehicle and satellite industries."

ATK composite structures can be found on the Boeing 767 and 757 airplanes, C-17 Globemaster, F-18 fighter, V-22 Osprey, Boeing 702 and GPS II-F satellites, and Delta II and Delta IV launch vehicles.

"We are honored to have gained Boeing's confidence to build composite substructures for the 787-9 and 787-10 airplanes," said Joy de Lisser, vice president and general manager of ATK's Aerospace Structures division. "Our manufacturing reputation is built on execution excellence, and we look forward to delivering world-class structures to Boeing to meet its increased 787 production rates."

ATK will provide composite substructures for the 787 center fuselage to Boeing at its South Carolina assembly facility and to Alenia for the aft fuselage.

FMI: www.atk.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC